fbpx

In 2022, Genfit successfully completed a solar PV installation at the River Alt Resource Centre, a project carried out simultaneously with an installation at Huyton Library over the course of just two weeks. Both projects exemplify Genfit’s commitment to delivering high-quality renewable energy solutions efficiently and effectively. Feedback from both sites was overwhelmingly positive, with all stakeholders expressing satisfaction with the installations.

At the River Alt Resource Centre, Genfit installed a solar PV system with a DC power capacity of 49.88 kWp. The system’s maximum achieved AC power was 33.3 kW, ensuring optimal performance and energy output. Annually, the installation is projected to generate 41.8 MWh of clean energy, contributing to a reduction of 8.08 tonnes of COâ‚‚ emissions. This environmental impact is equivalent to planting 371 trees, showcasing the significant benefits of transitioning to solar power.

The successful completion of these projects highlights Genfit’s expertise in providing tailored solar PV solutions and its ongoing mission to help communities and organizations reduce their carbon footprint.

Installed DC Power (kWp)

Max Achieved AC Power (kW)

Annual Energy Production (MWh)

CO2 Emission Saved (Tonnes)

Equivalent Trees Planted

Installation Video

Technology

Solar Panel

Longi Solar, LR4-60HPH-375M x 133

Warranty

Output Warranty Term: 25 years

Materials Warranty Term: 12 years

Efficiency

20.6%

Dimensions

1755 x 1038 x 35mm

Weight

19.5 kg

Inverter

SolarEdge 33.3K x 1

Optimiser

Solaredge P801 x 67