Kirkby Leisure Centre Goes Green

Get QuoteCall Now

Powering Kirkby Leisure Centre with Clean, Renewable Energy

Last year we completed a 344.89 kWp at Kirkby Leisure Centre. The PV system is estimated to produce 300 MWh of solar energy every calendar year and reducing the leisure centers carbon emissions by 57.87 tonnes which will help them be more environmentally friendly. This will also help Knowsley in hitting their target of becoming Net Carbon Zero by 2040. A commitment was also made to work with partner organisations to reduce boroughwide emissions. Since 2009/10, the council has reduced its emissions by 69%.

We used the 758 x LR4-72HPH-455M Longi solar panels with half the amount of SolarEdge P950 optimisers as they connect to two solar panels each. There are 3 inverters included in this system. two SolarEdge 100K Synergy Managers and one Solaredge 66.6K Synergy Manager.

Installed DC Power (kWp)

Max Achieved AC Power (kW)

Annual Energy Production (MWh)

CO2 Emission Saved (Tonnes)

Equivalent Trees Planted

Installation Video

Technology

Solar Panel

Longi Solar, LR4-72HPH-455M x 758

Warranty

Output Warranty Term: 25 years

Materials Warranty Term: 12 years

Efficiency

20.9%

Dimensions

2094 x 1038 x 35mm

Weight

23.5 kg

Inverter

SolarEdge 100K Synergy Manager x 2

SolarEdge 66.6K Synergy Manager x 1

Optimiser

P950 x 380