Genfit completed a rooftop Solar PV installation at Harpenden Memorial Hospital, delivered for Central London Community Healthcare NHS Trust (CLCH).
The project involved the installation of a new Solar PV system across the hospital roof, designed to generate clean renewable electricity directly on site and help reduce the building’s reliance on grid-supplied energy.
By making use of available roof space, the installation provides the hospital with a long-term renewable energy asset while supporting CLCH’s wider sustainability and carbon reduction objectives.
The completed system will help lower carbon emissions, improve on-site energy generation and contribute towards a more sustainable healthcare estate.
The installation utilises a SolarEdge commercial PV system, designed to provide high-efficiency energy conversion, module-level optimisation and detailed system monitoring.
1 × SolarEdge SE50K Synergy Manager inverter provides 50 kW maximum AC power and efficient three-phase conversion across the system.
75 × SolarEdge S1000 power optimisers help maximise module performance while providing detailed module-level monitoring.
147 DMEGC solar panels make up the 72.86 kWp system, including 131 × 500W modules and 16 × 460W modules.
Advanced SolarEdge monitoring and safety features provide real-time system visibility, optimiser-level performance data and enhanced DC safety.
The system is designed to generate approximately 67.32 MWh of renewable electricity each year, saving around 13 tonnes of CO₂ annually.
Delivering the Solar PV installation at Harpenden Memorial Hospital required careful planning, coordination and safety management to complete the works within an active healthcare environment while minimising disruption to day-to-day operations.
A 72.86 kWp rooftop Solar PV system designed, installed and commissioned at Harpenden Memorial Hospital for CLCH, with the works carefully coordinated around a live healthcare environment.
147 DMEGC solar modules installed across the hospital roof to generate clean renewable electricity on site.
1 × SolarEdge SE50K Synergy Manager installed alongside new DC/AC cabling and associated electrical connections.
75 × SolarEdge S1000 power optimisers provide detailed system monitoring, module-level optimisation and enhanced safety.
Full testing and commissioning completed in line with BS 7671, SolarEdge, DNO and relevant site requirements.
Delivering the Solar PV installation at Harpenden Memorial Hospital was a great project for the team. Working within a live healthcare environment meant careful planning and coordination were essential throughout. The finished system will help the site generate more of its own renewable electricity, reduce carbon emissions and support CLCH’s wider sustainability goals.
– Dave Houston
Director, Genfit