Genfit completed the installation of two solar PV systems at Jordangate and Grosvenor Multi-Storey Car Parks in Macclesfield, transforming the upper parking levels into renewable energy generation assets.
The project involved the installation of ground-mounted solar PV systems across the top levels of both multi-storey car parks, designed to make effective use of available space while supporting the generation of clean, renewable electricity.
With a combined 986 solar panels and a total installed capacity of 400 kWp, the two systems are designed to generate approximately 330 MWh of renewable electricity annually, helping to reduce reliance on grid electricity and support long-term sustainability objectives.
Together, the installations are estimated to save approximately 64 tonnes of CO₂ emissions annually, equivalent to planting 2,912 trees, demonstrating how existing urban infrastructure can be used to generate renewable energy and reduce environmental impact.
The installations utilise SolarEdge commercial PV technology, combined with specially designed ground-mounted systems positioned on the upper levels of Jordangate and Grosvenor Multi-Storey Car Parks. The systems were designed to maximise renewable energy generation while making effective use of existing urban infrastructure.
4 SolarEdge inverters and 494 power optimisers help maximise energy generation and ensure efficient performance across both installations.
Combined installed capacity of 399.34 kWp, with a maximum achieved AC power of 306.5 kW, converting solar energy into usable electricity.
Advanced SolarEdge monitoring technology provides detailed system performance data, allowing energy generation and individual panel performance to be monitored.
Enhanced safety features, including module-level monitoring and SolarEdge SafeDC™ technology, help reduce DC voltage to safer levels when the systems are shut down.
Delivering the combined 399.34 kWp solar PV installations at Jordangate and Grosvenor Multi-Storey Car Parks required careful planning, engineering coordination and safety management.
With both systems installed on the upper levels of existing multi-storey car parks, particular consideration was given to structural loading, mounting system design, working at height and the safe delivery of materials, alongside minimising disruption to car park operations.
Genfit designed, installed and commissioned two ground-mounted solar PV systems across the upper levels of Jordangate and Grosvenor Multi-Storey Car Parks in Macclesfield. With a combined capacity of 399.34 kWp, the installations transform existing car park infrastructure into renewable energy generation assets.
986 LONGi solar panels installed across both car parks using ground-mounted support structures positioned on the upper parking levels.
4 SolarEdge Synergy inverters and 494 power optimisers, supported by DC/AC cabling and electrical connections to the existing site infrastructure.
SolarEdge monitoring technology provides detailed performance tracking, while integrated safety features support safe and reliable system operation.
Full system testing and commissioning, including electrical verification and compliance with BS 7671 and applicable DNO connection requirements.
Completing these two solar installations at Jordangate and Grosvenor Multi-Storey Car Parks is something we’re really proud of. Installing ground-mounted solar systems on top of existing car parks presented a unique opportunity to make better use of urban space. With a combined capacity of nearly 400 kWp, it’s a great example of how existing infrastructure can be transformed to generate clean energy, reduce carbon emissions and support a more sustainable future.